PILWA | ||||
Location: , Cost: 100000 GDP Benefits: Status: planned Maximum stored water capacity: 40000 cubic metres Project type: johad Context: https://www.waterways.world Description: Pilwa is a completely arid catchment with a dry river of about 45 kms in length. Because of low precipitation and poor catchment management, the river has been dry since many years. The land under farming is currently only around 2%. |